Mandala Custom Round Home Assembly in 6 Easy Steps

Step 1

The Mandala designer will create detailed foundation drawings and guide the general contractor through the assembly process. Once the foundation is complete (provided by others), assemble the pre-cut flooring pieces supplied in the Mandala Home kit.

Step 2

Stand and brace the perimeter walls.

Step 3

Stand and brace the central ring and platform. This is ideally done using a boom truck or crane (as shown), but on smaller homes can be done by hand with four people.

Step 4

Assemble the engineered truss roof system and apply the pre-cut plywood roof sheathing.

Step 5

Attach the pre-assembled soffit panels and the pre-cut corner trim and fascia.

Step 6

Install the roofing material (not supplied), install the skylight, and hang the exterior doors (not supplied).

WEATHER TIGHT SHELL IS COMPLETE!